New Resident Utility Setup
Cayetano Villas Apartment Utility Setup in Saint Hedwig, TX
Quick Answer
Is electricity included in rent at Cayetano Villas?
Most apartment communities like Cayetano Villas in Saint Hedwig bill electricity directly to the resident rather than including it in rent, often through a sub-meter or a RUBS (Ratio Utility Billing System) allocation. Confirm the exact billing method directly with Cayetano Villas's leasing office before signing.
Moving into Cayetano Villas in Saint Hedwig, Texas? Below is your verified utility setup guide — every provider, phone number, and signup link for electric, gas, water, internet, and renters insurance at this building.
Cayetano Villas is in the Oncor Electric Delivery service area. Most Oncor addresses qualify for same-day Ambit Energy enrollment.
Utility Snapshot
Utility snapshot for Cayetano Villas
Electric Delivery (TDU)
Oncor — outage line 888-313-4747
Water & Sewer
Saint Hedwig Water Supply
Est. First-Month Electric Cost
$85–$176/mo on the Texas Solar Buyback 24 plan, based on typical apartment usage of 500–1,000 kWh.
Deposit
No deposit required for qualified customers who enroll with Ambit Energy.
Delivery and rate data specific to Saint Hedwig's TDU zone, Ambit Energy rates as of 2026-04-18.
Move-In Checklist
Your move-in checklist for Cayetano Villas
7 days before move-in
Start Ambit Energy electric service in Oncor's territory now, so power is already on when you carry the first box into Cayetano Villas.
3 days before move-in
Set up water and sewer service with Saint Hedwig Water Supply before your keys are handed over, so the account isn't left in the previous tenant's name.
Move-in day
Walk your new unit at Cayetano Villas and confirm lights, outlets, and any gas appliances are live before you sign the move-in inspection sheet.
First week
Schedule Spectrum internet installation for your first week at Cayetano Villas — installers typically book 3-5 days out.
Plan Comparison
Ambit Energy plans sized for Cayetano Villas
Compared at apartment-scale usage (500–1,000 kWh/month) for the Oncor delivery zone.
| Plan | Term | 500 kWh Rate | 1,000 kWh Rate |
|---|---|---|---|
| Budget Relief 12 | 12 mo | 23.0¢/kWh | 16.5¢/kWh |
| Texas Solar Buyback 24 | 24 mo | 17.0¢/kWh | 17.6¢/kWh |
| Texas Solar Buyback 12 | 12 mo | 17.0¢/kWh | 17.6¢/kWh |
Rates include TDU delivery charges and the E-Plan discount where offered. See the Electricity Facts Label for complete pricing details.
Neighborhood Connectivity
Internet providers near Cayetano Villas
Based on provider coverage reported for Saint Hedwig, TX:
Spectrum
T-Mobile
GVTC FiberFiber available
Moving into Cayetano Villas? Let's get your power on.
Sign up for Ambit Energy online in minutes — same-day service available for most Saint Hedwig addresses.