New Resident Utility Setup
Ascend at the Parkway Apartment Utility Setup in Brookshire, TX
Quick Answer
Is electricity included in rent at Ascend at the Parkway?
Most apartment communities like Ascend at the Parkway in Brookshire bill electricity directly to the resident rather than including it in rent, often through a sub-meter or a RUBS (Ratio Utility Billing System) allocation. Confirm the exact billing method directly with Ascend at the Parkway's leasing office before signing.
Moving into Ascend at the Parkway in Brookshire, Texas? Below is your verified utility setup guide — every provider, phone number, and signup link for electric, gas, water, internet, and renters insurance at this building.
Ascend at the Parkway is in the Oncor Electric Delivery service area. Most Oncor addresses qualify for same-day Ambit Energy enrollment.
Resident Sentiment
What residents say about Ascend at the Parkway
Top 5 resident reviews from Google, sorted by rating.
Ascend at the Parkway is a beautiful new apartment community in the Tamarron area of Katy. Designed by DR Horton, the community really reflects thoughtful planning and quality craftsmanship throughout. The layouts are modern and functional, and the finishes feel fresh without…
Such a gorgeous new community! The amenities are stunning, and the model really gives you a feel for the luxury lifestyle they’re creating. You can tell a lot of thought went into the design and layout. The staff is professional, helpful, and genuinely excited about the prope…
Robin was amazing during my tour! 😁 we toured different floorplans until we were able to make the right decision. Community was clean and very friendly staff and other residents.
What a beautiful place to live. The complex has wonderful amenities. The tour was amazing and Kay was an excellent host to show me the property. Thank you Kay.
Kay was incredible! Thank you so much for all the information. The customer service skills were amazing; I felt welcomed as soon as I walked in.
Utility Snapshot
Utility snapshot for Ascend at the Parkway
Electric Delivery (TDU)
Oncor — outage line 888-313-4747
Natural Gas
CenterPoint Energy
Water & Sewer
Brookshire Municipal Water System
Est. First-Month Electric Cost
$85–$176/mo on the Texas Solar Buyback 24 plan, based on typical apartment usage of 500–1,000 kWh.
Deposit
No deposit required for qualified customers who enroll with Ambit Energy.
Delivery and rate data specific to Brookshire's TDU zone, Ambit Energy rates as of 2026-04-18.
Move-In Checklist
Your move-in checklist for Ascend at the Parkway
7 days before move-in
Start Ambit Energy electric service in Oncor's territory now, so power is already on when you carry the first box into Ascend at the Parkway.
3 days before move-in
Call CenterPoint Energy to start gas service — most Texas gas utilities need 1-3 business days to schedule a technician.
Move-in day
Walk your new unit at Ascend at the Parkway and confirm lights, outlets, and any gas appliances are live before you sign the move-in inspection sheet.
First week
Schedule Xfinity internet installation for your first week at Ascend at the Parkway — installers typically book 3-5 days out.
Plan Comparison
Ambit Energy plans sized for Ascend at the Parkway
Compared at apartment-scale usage (500–1,000 kWh/month) for the Oncor delivery zone.
| Plan | Term | 500 kWh Rate | 1,000 kWh Rate |
|---|---|---|---|
| Budget Relief 12 | 12 mo | 23.0¢/kWh | 16.5¢/kWh |
| Texas Solar Buyback 24 | 24 mo | 17.0¢/kWh | 17.6¢/kWh |
| Texas Solar Buyback 12 | 12 mo | 17.0¢/kWh | 17.6¢/kWh |
Rates include TDU delivery charges and the E-Plan discount where offered. See the Electricity Facts Label for complete pricing details.
Neighborhood Connectivity
Internet providers near Ascend at the Parkway
Based on provider coverage reported for Brookshire, TX:
Xfinity
AT&T FiberFiber available
T-Mobile
Moving into Ascend at the Parkway? Let's get your power on.
Sign up for Ambit Energy online in minutes — same-day service available for most Brookshire addresses.